A417 Missing Link - Survey Control Points & Topographical Surveys

Published: 29th December, 2023 Re-Tender/End Date: 25th February, 2028
Description
Buyer:
Winner
To see what other contracts the winner has been awarded, click on their name
Info:
Purpose of Notice - The procurement of a Subcontractor for the survey control points and topographical survey works in connection with the A417 Missing Link at Air Balloon. Scheme Description - Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon. The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley. Registering Interest - Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.;
Industry:
Info Sheet